CONE CRUSHER MAINTENANCE
A. The materials must be in the middle of the distributor. It is not allowed to put the materials into the crushing chamber directly, because it will make the crusher overloaded and the liner plate will be abraded unevenly.
Correct feeding conditions:
a. The materials are distributed equally to the crushing chamber.
b. The quantity of materials should not higher than the mortar.
B. The max feeding size should not equal to the feed opening, (the max feeding size≤85% of the feed opening) otherwise, it will lead to:
a. The capacity is low
b. Some spare parts will be damaged.
C. Crusher is not allowed to start in overload condition in case of accident.
D. When stop the crusher, stop the feeder first. After the materials are all discharged out, stop the crusher.
E. The locking system and hydraulic station should be checked often to avoid problems.
2). Capacity of the crusher
Capacity is subject to feeding method, material size, size of final product, material nature, temperature, etc. the range is wide. The capacity is under certain conditions.
3). Discharging Adjustment :
1)Abrasion of crushing wall and breaking wall enlarge the discharging outlet, so outlet sizes should be adjusted through hydraulic oil pump at regular intervals.
4).Springs:
(1). The function of springs are: when some uncrushed materials enter the crusher, they will prevent crusher from damaging. Therefore, the pressure of the springs and the crusher is corresponding to each other. If the crusher is in good condition, the spring is stable; only when uncrushed materials enter the machine will the springs be pressed.
(2). If the upper part of crusher vibrates, clients are required to check the machine carefully and solve the problem. If pressing the springs incorrectly, some parts may be damaged, because pressing the spring will increase the pressure of the crusher.
The reason why the upper parts of crusher vibrate is:
A. Feeding unevenly or overfeeding
B.There are many small lump materials in the raw materials or the humidity is too high
C.The discharge opening is too small.
5). Change of mortar:
There are u-shaped bolts on the adjusting ring. Fill zinc alloy into the space. When installing or changing the mortar, after 6-8 hours’ operation, check the fastening conditions and screw the U-shaped bolts again.
6). Change of the crusher inner wall:
The cone crusher inner wall is fixed to the cone crusher body through a cone end. There is zinc alloy between them. When installing or changing the inner wall, after 6-8 hours’ operation, check the fastening conditions. If there is loose, fasten it.
7). Mesh of gears:
The friction of round plate changes the gap between gears. To make the gears properly meshed, clients are required to put a mat on the bottom cover. The thickness of the mat should equal to the friction of the round plate.
8). Bowl-shaped bearing and sealing device (diagram 13):
When installing the bowl-shaped bearing, make sure the oil seal is not damaged by the steel cable.
When assembly, scrape the spherical surface to ensure the space between crushing cone and the spherical surface is kept within 0.35-0.5mm.
The bowl-shaped tile is fixed to the bowl-shaped bearing support through lock pins to prevent the tile rotate in circle.
The bowl-shaped bearing support and the frame is fixed together by lock. If there is space between the support and the frame, deal with it immediately.
9). The cylinder liner and the frame is the third transient assembly. To avoid the liner rotating, the upper part of liner is filled with zinc alloy. When changing new liner, make sure it is according to the practical size because the after long time’s operation and assembly, some changes may happen to the crusher. If the space is too large, the liner will be broken.
10). Conic liner:
The cone cover and the eccentric shaft should wring each other. Fill in some zinc alloy to stop the cover rotating. The space should be full of zinc alloy. The cover may change its shape due to the hot zinc alloy, so check the size of d1, d2 and B of a new cover (diagram 14).
11).The clearance of the the eccentric shaft cover and the bush of the frame, and the clearance of the main shaft’s taper and the axle cover should accord with a=3-3.6mm;b=2.9-3.6mm;c=9-10mm. (diagram 15)
12).prevention of dust with water seal:
A、Don’t use the dirty water;
B、Don’t supply water too much, or arose the mix of water and oil;
C、Often be observed the backwater from the bugle of the backwater
D、Often check the annular ring and the ring of the prevention of dust, and clean up the flume.
SEE ALSO
Portable jaw crushing plants are one type of portable crushing plants. They are combination of jaw c...
Combine crushing plants and track, it comes the track mounted crushing plant. Some of the crushing ...
Zenith B Series VSI Crusher is one of the most advanced impact crusher nowadays. It introduces high ...
Inquiry
Zenith crushing plants and grinding mills are exported all over the world, more than 100 countries:
Africa
Europe
South Africa
Malaysia
India
Pakistan
Sri Lanka
Philippines
Brazil
Egypt
Ghana
Uruguay
Mexico
Vietnam
Nigeria
Angola
Congo
Sudan
Kazakhstan
Uzbekistan
Algeria
Chile
Peru
Indonesia
Nepal
Russia
Afghanistan
Colombia
Zambia
Lao Pdr
Australia
More...
Contact Us
Add:
No.416 Jianye Road
South Jinqiao Area,Pudong
Shanghai, China
Zip: 201201
Tel : 0086-21-58386256
0086-21-58386258
Fax: 0086-21-58385887